Ewo Pulse Lagoon by Sorgiva Ewo Pulse Lagoon by Sorgiva
EN
Pool renovated into a natural lagoon with a beach
Renovate your pool

Your pool can become a natural lagoon.

No need to demolish: we transform your existing pool into a lagoon with gradual beach entry, quartz sand and water rising from the floor.

Illustrative rendering
Before and after

From traditional pool to natural lagoon

Traditional rectangular tiled pool
Before
The same pool transformed into a natural lagoon
After

Simulated images for illustrative purposes.

More than just the coating

We renew the system too

The renovation includes rebuilding the recirculation and suction system: the pool gets a new look and becomes safer too.

  • On any pool: concrete, liner or panel
  • New recirculation and suction system, installed to code
  • Gradual beach entry and a quartz finish of your choice
  • Timings set after the technician's site visit
Cross-section of a pool with the Sorgiva system
The Sorgiva system: water is fed in beneath the finish and drawn off at the surface.
Run a hospitality business?

A new look and a new system, in a single project

Law 142/2026 · art. 4-bis

Pool safety: what changes for hospitality properties

Since 8 August 2026, article 4-bis of Italian Law no. 142 of 4 August 2026 has been in force. Pools open to the public or for shared use, such as those at hotels, B&Bs, agriturismi and campsites, must have a recirculation system that prevents suction entrapment, meaning bathers being drawn towards the suction points. If the system does not comply, the pool faces immediate closure until it is brought up to standard.

The technical reference is standard UNI EN 13451-3:2025, in force since 10 July 2025, which sets the safety requirements for water inlet and outlet components in public swimming pools.

Pulse Lagoon: no inlet jets, with anti-entrapment floor outlets

With patented Sorgiva technology, filtered water rises evenly across the entire pool surface, with no inlet jets. The floor outlets are anti-entrapment, with no visible grilles, and the technical system is installed to code. On completion, a certificate of conformity for the plant room is issued.

The information on this page is for guidance only and does not constitute legal advice. The compliance of each system must be checked by a qualified technician. Sources: Gazzetta Ufficiale (Italian Official Journal) no. 182 of 7 August 2026 · UNI EN 13451-3:2025

How it works

Three steps, no surprises

Send us measurements and photos

Fill in the form below with approximate measurements and a few photos of your current pool.

Technical site visit

A specialist technician comes to you and assesses the pool and the existing system.

Design, timings and costs

You receive a renovation design with timings and costs set out for your project.

Request an assessment of your pool

With measurements and a few photos we can give you an initial assessment before the site visit.

The pool belongs to… *

Photos in JPG or PNG format, 8 MB maximum in total.